Total IVt as written. Pick the meter on the next tab — its iV is not added again.
Volume of the smallest occupied room the pipework under test passes through — not every room on site. Leave blank for Type A. Use “No occupied space / ≥ 60 m³” only if that is actually the case.
Or from room size
The drop on the gauge over the tightness test duration. Let-by is a rise — do not enter that here. Actual leak rate is calculated from this drop.
Are you sure you want to go back? You may lose any data you have inputted.
Date and time are filled automatically.
Enter engineer name and location.